Exciting Plans for Move Altrincham

The multi million pound revamp of Altrincham Leisure Centre is well underway and will open early 2025 as move Altrincham.

The new look centre, branded move Altrincham, is due to open early 2025 will benefit from a 25m swimming pool, a 20m learner pool, a pool pod to improve accessibility, a combined lobby area with pool viewing and café, a wet village change, an inclusive changing places toilet and a stunning health and wellbeing spa facility.

There will also be a wellness assessment room, an enlarged fitness suite, fitness changing and dry change areas, two flexible studio spaces, an immersive indoor cycle studio, a four-court sports hall and storage, a gymnastics hub and staff rooms, and offices.

What’s really exciting is that move Altrincham will include the replacement of the fossil fuel (gas) heating system with air sourced heat pumps and solar panels, which are significantly more sustainable options than the existing systems and support Trafford Council’s action plan to be carbon neutral by 2038.

Future Front Entrance / Cafe

Pool Refurbishment

What move Altrincham will benefit from:

  • 25m swimming pool

  • 20m learner pool

  • A Health and Wellbeing Spa

  • A pool pod to improve accessibility

  • A combined lobby area with pool viewing and

  • Café

  • A Wet Village change

  • An inclusive changing place toilet

  • A wellness assessment room

  • An enlarged Gym

  • Fitness changing and dry change areas

  • Two flexible studio spaces

  • An immersive indoor cycle studio

  • A four-court sports hall

  • A Gymnastics Hub

  • Staff rooms and offices

Stay in the loop about the refurbishment progress and exclusive offers on the horizon! Also, keep an eye out for upcoming job opportunities.